Preloader Close

Plant

Plant Joint Venture Enquiry

Our plants are well secured for all the safety measures. The well blended mixture of LPG is received from the nearby Bulk LPG sources Refineries/ Import Terminal it is then unloaded safely in storage tanks through proper leak proof pipelines. Later this gas is filled in Cylinders. In order to prevent any mishaps of any kind of dangerous explosion, before & after quality checks are done which are the most important criteria in this process. Close check is given for Blow cavity of the valve outlet with air in case any water is observed. Later security cap is fixed on the valve outlet.

This not the end of the process, rather it starts off, then all the cylinders have to go through rigorous Statutory tests & quality checks to assure 100% safety, till the time it reaches to the end consumer.

Get In Touch

Plant Enquiry Form